At the corner of Oakwood Avenue and Vaughan Road, a traffic island splits off a northbound right-turn channel, and a palm tree sculpture stands on it. The Oakwood Village Streets Plan has already decided what happens to that island. The channel closes, the island becomes a parkette, and left turns from Vaughan onto Oakwood end. But nothing changes there before the City repaves Vaughan Road in 2028.

The rest of the plan follows the same rule. Toronto and East York Community Council adopted it on May 28, 2026, and City Council passed the companion road-safety package on June 24 and 25. Every measure in it now waits on one of three things: a paint crew, a new traffic signal at Oakwood and Holland Park, or the Vaughan Road paving schedule. The order those three arrive in decides which blocks change first. The first round of work was the lightest. The changes that affect turns, parking and crossings on the main streets come later.

The paint went east of Oakwood first

The City's July 2026 installation notice set out the first round of work for the week of July 27, 2026, with about two weeks of work depending on weather. All of it was east of Oakwood Avenue:

  • Robina Avenue, and sections of Holland Park, Hursting and Maplewood avenues: painted sharrows marking a lane shared by drivers and cyclists
  • Earlsdale Avenue, Oakwood to Winona Drive: a contra-flow bike lane for eastbound cycling, with parking fixed permanently to the south side
  • Arlington Avenue, Hursting to Maplewood: parking fixed to the east side, plus a contra-flow lane for northbound cycling

The City says sharrows don't change how cars move or where they park. On Earlsdale and Arlington, the real change for drivers is that parking now stays on one side of the street. The project page put the work window at the week of July 27 through the week of August 10. That page was last updated August 25 and doesn't say which pieces were finished. If you're checking your own street, compare it against the notice rather than assuming it's all done.

Everything on Oakwood itself waits for one signal

The notice says changes "on, and west of Oakwood Avenue" will go in once a new traffic signal at Oakwood Avenue and Holland Park Avenue is installed, which the City expects in late 2026 or early 2027. A second new signal at Vaughan Road and Wychwood Avenue is on the same timeline.

The Holland Park signal unlocks three changes, all set to follow it:

  1. A contra-flow bike lane on Holland Park between Robina and Oakwood. This extends the existing westbound one-way stretch from the Green P lot to Oakwood so cyclists can ride west.
  2. A contra-flow lane on Holland Park between Oakwood and Glenholme for eastbound cycling, with parking fixed to the south side.
  3. A northbound bike lane on the east side of Oakwood Avenue between Earlsdale and Holland Park, protected by a lane of parked cars.

Council's decision also makes Holland Park one-way eastbound for 52 metres east of Oakwood. Council's decision on item TE33.53 gives that exact length, and it's the only one-way conversion Council approved in the whole plan. The signal also removes parking. The June 23 supplementary staff report lists nine paid spaces on Oakwood, three paid spaces on Holland Park east of the signal and two permit spaces west of it.

Further south, a new signal for pedestrians will replace the existing crossing at Oakwood and Clovelly Avenue. Staff class that as a medium-term item, two to five years out.

Speed humps and 30 km/h limits arrive within two years

Staff put the speed humps, speed limit changes, flexible speed signs and turn restrictions in the "short-term" group. That means somewhere from six months to two years after approval. It's a range for delivery, not an installation date for each street.

The Community Council decision on TE33.52 approves 46 speed humps on these segments:

Street Segment Humps
Alameda Avenue Eglinton Ave W to Vaughan Rd 7
Lauder Avenue Vaughan Rd to north Genessee Ave intersection 7
Winona Drive Eglinton Ave W to Belvidere Ave 6
Robina Avenue Earlsdale Ave to St. Clair Ave W 5
Gloucester Grove Glenholme Ave to Alameda Ave 4
Keywest Avenue Dufferin St to Lauder Ave 3
Lauder Avenue Rogers Rd to Rosecliffe Ave 3
Winona Drive Vaughan Rd to Holland Park Ave 3
Amherst Avenue Glenholme Ave to Oakwood Ave 2
Atlas Avenue Gloucester Grove to Ava Rd 2
Earlsdale Avenue Oakwood Ave to Winona Dr 2
Lanark Avenue Oakwood Ave to Alameda Ave 2

The City's project page says humps are coming to "14 streets." The formal decision lists the 12 segments above, on 10 different streets. Glenholme Avenue and Northcliffe Boulevard show up in the staff report's summary table, but the decision doesn't approve humps on either one. What those two streets do get is a speed limit cut from 40 to 30 km/h between Eglinton and Vaughan. City Council lowered Vaughan Road to 30 km/h as well, between Oakwood and Dufferin. Flexible in-road signs reminding drivers of the 40 km/h limit are planned on Rogers Road between Northcliffe and Lauder, and on Vaughan Road between Atlas and Winnett.

The most specific of the short-term changes is at Oakwood and Earnscliffe Road. Council banned southbound right turns and northbound left turns from 7:30 to 9 a.m. and 2 to 3:30 p.m. on weekdays, holidays excepted. Parking is also banned at all times on a short stretch of Oakwood's west side just south of Earnscliffe. The staff report ties the timed turn bans to drop-off traffic around Rawlinson school.

Vaughan Road and the parkette wait for 2028

The changes that will feel biggest are on Vaughan Road, and they're tied to the 2028 resurfacing. Detailed design runs through 2026 and 2027. At Vaughan and Oakwood, Council banned eastbound and westbound left turns and the northbound right turn. The redesign closes the right-turn channel and adds curb extensions, realigned crosswalks and a corner protected for cyclists. Along the corridor, westbound cyclists get continuous protection from Wychwood Avenue to Dufferin Street, and corners are tightened at 13 crossings. Staff say the bike changes don't remove any car lanes. The supplementary report and the current project page name different side streets for curb extensions, so the final list depends on the detailed drawings.

The parkette is the part the neighborhood has had the most say in. The City's August 2026 consultation report drew 108 survey responses between June 26 and July 13. People asked for more shade, seating and greenery, less branding, and color rather than a rust-like finish. They were split on the palm tree sculpture. Most said it meant little to them, while some wanted it back in the new design with better signage explaining why it matters. Some worried that removing the right-turn lane would push traffic onto Jesmond Avenue. Others raised loitering and long-term upkeep.

Why the order looks the way it does

The rollout order lines up closely with how much each change divided the neighborhood. In the City's Phase 2 consultation report from December 2025, 80% of respondents supported the crossings, 77% supported the intersection improvements and 75% supported safety changes on the Oakwood corridor. Changing street directions split almost evenly, 42% for and 40% against. The Oakwood and Vaughan turn bans drew between 35% and 41% support and between 36% and 42% opposition. People raised access to their homes and traffic spilling onto side streets. The Holland Park signal did better, at 62% support and 23% opposed.

The most contested ideas were narrowed or dropped. The proposed eastbound conversion of Durham Avenue went to the Eglinton–Allen study. One-way loops and eastbound changes on Millerson and Earnscliffe were dropped after mixed feedback and concerns about access. A pedestrian crossing at Oakwood and Glenhurst Avenue wasn't approved, but staff may reconsider it if nearby development brings more people walking there.

Some streets are still under study. Councillor Alejandra Bravo's amendment asked staff to assess speed humps on Glenhurst Avenue and on Glenholme between Conway and Millerson. It also asked for quick-build safety options at Glenhurst–Robina, Cloverlawn–Westmount, Cloverlawn–Northcliffe, Northcliffe–Rosecliffe and Lauder–Holland Park. A follow-up review of crosswalks on Winona Drive found four all-way-stop intersections that qualify for new crosswalk markings: Earlsdale Avenue, Hursting Avenue, Dundurn Crescent and Glenhurst Avenue. Earlsdale could go in with the East-West Connections work. Staff estimated the rest at one to three years, depending on citywide priorities.

The longest-term items have no schedule at all. Missing sidewalks on Glenhurst, Northcliffe, Winnett and Winona, more work on the Oakwood corridor, and physical separation for the Rogers Road bike lanes all sit beyond five years. Each still depends on future funding, design and approval. The Oakwood and Conway quick-build treatment went in back in November 2025, so the Oakwood Avenue curb changes in this plan aren't the first on that street. The next ones arrive with the Holland Park signal this winter. Vaughan Road's turn bans and the new parkette come with the paving crews in 2028. For a wider look at how the area has changed since the Crosstown opened, see our piece on where Oakwood's comeback is actually happening.

If you're weighing a home on one of the streets in that hump table, or a condo where the curb on Oakwood is about to change, Shirel Shayo can walk you through what's been approved for your block and when it's expected. Connect for a personalized consultation, or browse our Oakwood Village neighborhood guide.

Work With Shirel

Whether you’re entering the market or preparing to sell, expect a calm, modern, and detail-driven experience shaped entirely around you.